The contractor supply company delivered all the insulation and drywall needed for the soundproofing project on Saturday. They ran late, I'm lucky they got there before Buzz had to leave, as he was going out of town for the weekend. For some reason I thought I would be able to carry the drywall myself. But even if I could lift the panel, I'd never be able to maneuver it into the house, those things are unwieldy!
We moved 22 panels of 5/8" 4'X8' Sheetrock, at around 90 pounds apiece. This means we moved nearly 2,000 pounds of gypsum. No wonder I was exhausted afterwards (not to mention I was hungover and on less than4 hours of sleep). Why are these projects always so much harder (and expensive) than you initially think? Even when you try to compensate in your mind, the reality is always much worse.
I have no idea how we're gonna get the drywall into the basement, I'll probably have to cut it first (oh boy, more dust!). Actually I should cut an 8-foot long slot in the floor and just slide the panels through to the cellar. Hey, it's my house dammit.